人人超人人超碰超国产_日韩精品一级无码毛片视频免费_中文字幕丝袜人妻在线_日日一级日韩18岁5毛黄片_少妇白洁av免费在线观看_CHINESE男同白袜调教网站_亚洲精品综合影院伊人_2019最新黄片中文字幕_了解最新免费看黄色的软件_久热中文字幕在线

News

News

Home| News| News

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-7-22 2550 Font size:

Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.

In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.


6ce26866113e5e61e5841209cad8067.png